Featured Project

Bristol

Hard Rock Casino

This project included 133,000 sf+ of Granite, Marble, Quartz, Zellige tile, Encaustic look tile, Thin Brick, book-matched GPTP, Numbered glass mosaic features, 35,000 sf+ of quarry tile with Industrial epoxy and 13,500+ sf of Terrazzo with waterjet “Wave” pattern. The project started in April 2024 and was completed in November 2024, over 5.5 million dollars of work in 7 months. The schedule was accelerated by 4 months, requiring long shifts with limited days where no prepping, installation or grouting occurred.


Project Type: , ,

Industry: Hotel & Resort Restaurant

Location: Virginia

Project Status: Completed